Power for new sections, expansions, and planned shutdowns
Mining operations can't wait for grid or substation infrastructure to catch up. We supply standalone and synchronised generator systems sized for continuous, high-load operation, plus the ATS and distribution infrastructure to run it safely on site.
- Range
- Up to 3000 kVA
- Config
- Synchronised · Continuous
- Use
- Pits · Expansions · Shutdowns
- Package
- Genset + ATS + DB + Cable
LARGE-FRAME UNITS · ON THE ROAD TO SITE
Production can't wait for the substation
Expansion ahead of the grid
New pits and sections often run before permanent grid or substation infrastructure is in place.
Continuous, high-load operation
Where a single unit isn't enough, synchronised generator systems carry the load and keep running through maintenance.
Planned shutdowns and upgrades
Bridging power keeps critical systems running while on-site grid infrastructure is maintained or upgraded.
Safe on-site integration
ATS and distribution infrastructure supplied with the generators, specified for the site.
High-load sets, delivered and commissioned
Keep the section producing
Share the load, duty cycle and timeline, and our team will specify a synchronised package.