Temporary power from groundbreak to grid connection
New sites don't wait for permanent power. We supply and install standalone or synchronised generators, ATS, distribution boards, and cabling to keep your site office, batching plant, cranes, and security running through every phase of the build.
- Range
- 30 kVA and up
- Loads
- Offices · Batching · Cranes
- Package
- Genset + DB + Cable
- Changes
- Swap units per phase
TRAILER-MOUNTED TEKSAN · READY TO TOW
Power that changes with every phase of the build
No grid connection yet
Until the permanent connection lands, generators are core site infrastructure, not a backup.
Loads that change by phase
Earthworks, structure and fit-out each draw differently. We right-size and swap units as you move through the build.
Tender and start-date pressure
Temporary power is often a named line item in tenders. We quote fast enough to fit your submission and your site start date.
One supplier for the whole setup
Distribution boards and cabling come with the generator, so you aren't waiting on a second supplier.
Delivered, placed and running
Power your site from day one
Send us the site location, phase and expected loads, and we'll quote the complete package.